'Monty'
1975 Land Rover Series 3 2.5NA
The story continues....... January 2014 - December 2015
       
 
August 2014-New floors installed
August 2014-New floors installed
August 2014-New floors installed
 
     
 
September 2014 - Bulkhead primered
September 2014 - Bulkhead primered
 
     
 
September 2014 - Clock binnacle removed
September 2014 - Clocks removed from binnacle
 
     
 
September 2014 - Custom rear loom
September 2014 - Custom front and rear loom
 
       
 
September 2014 - Original loom
September 2014 - Front to rear loom
September 2014 - Front loom
 
       
 
September 2014 - Rear tub prep
September 2014 - Rear tub prep and repair
September 2014 - Rear tub and wings prep
 
     
 
October 2014 - Prepped tub re-mounted
October 2014 - Original seats and seatbox need some work
 
     
 
November 2014 - Steering box refurb
November 2014 - Steering box refurb
 
     
 
November 2014 - Bulkhead painted
November 2014 - Bulkhead painted
 
       
 
December 2014 - Seat base prep
December 2014 - Seat rebuilt and covered
December 2014 - Seat rebuilt and covered
 
       
 
December 2014 - Offside steering assembly
December 2014 - Hub refurb and paint
December 2014 - Offside steering assembled
 

| Page 1 | Page 2 | Page 3 | Page 4 |